Brokering
A duplex delivered five months early, then refinanced to hold
Construction facility → residual stock · La Trobe Financial
5 months
ahead of schedule

Hands-on progress-claim management delivered a duplex five months early — with the exit planned in advance, one dwelling sold at auction and one refinanced to hold.
The situation
A two-dwelling duplex development in Altona North, funded by a La Trobe Financial construction facility, running in parallel with several other active projects in the same portfolio.
What we did
We ran the facility hands-on from settlement to completion — managing the full progress-claim cycle, including QS inspection bookings, claim submission, drawdown letters and payment follow-through, so that construction was never waiting on funding. As completion approached we planned the exit before it was needed rather than after: one dwelling to market, one to be retained and refinanced.
The result
The project completed five months ahead of schedule in May 2025. Dwelling B sold at auction on 5 July 2025 for $1,250,000 and settled two months later. Dwelling A was refinanced onto a 12-month La Trobe residual stock loan, letting the client hold the asset without a fire sale and without the construction facility's cost or covenants.
Why it matters
Finishing early only creates value if the finance is ready to flex with you. Planning the exit — sale for one, residual stock for the other — meant an early completion turned into realised profit on one side and a retained asset on the other.
Related reading
This case study is a representative example. Full details and figures are available on request — get in touch to discuss a comparable structure for your project.
{"@context":"https://schema.org","@graph":[{"@type":"Article","@id":"https://www.siare.com.au/case-studies/duplex-early-completion-altona-north#article","headline":"Duplex construction finance, delivered early and refinanced to hold","description":"Hands-on progress-claim management delivered an Altona North duplex five months early, then refinanced one dwelling to residual stock. See the structure.","inLanguage":"en-AU","articleSection":"Case study","about":[{"@type":"Thing","name":"Construction finance"},{"@type":"Thing","name":"Progress claims"},{"@type":"Thing","name":"Quantity surveyor drawdowns"},{"@type":"Thing","name":"Residual stock finance"},{"@type":"Thing","name":"Duplex development"}],"image":["https://cdn.prod.website-files.com/6a2faec687d0075e0137f9ba/6a33c6afcded1e73f47fd4a9_siare-aerial-development.jpg"],"author":{"@id":"https://www.siare.com.au/#organization"},"publisher":{"@type":"Organization","@id":"https://www.siare.com.au/#organization","name":"Siare","url":"https://www.siare.com.au/","logo":{"@type":"ImageObject","url":"https://cdn.prod.website-files.com/6a2faec687d0075e0137f9ba/6a7d2d79d9ee56b9be94a56c_Transparent%20Logo.png"},"address":{"@type":"PostalAddress","streetAddress":"Level 2, 161 Collins Street","addressLocality":"Melbourne","addressRegion":"VIC","postalCode":"3000","addressCountry":"AU"},"email":"info@siare.com.au"},"isPartOf":{"@type":"WebPage","@id":"https://www.siare.com.au/case-studies/duplex-early-completion-altona-north"},"mainEntityOfPage":{"@type":"WebPage","@id":"https://www.siare.com.au/case-studies/duplex-early-completion-altona-north"}},{"@type":"BreadcrumbList","@id":"https://www.siare.com.au/case-studies/duplex-early-completion-altona-north#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://www.siare.com.au/"},{"@type":"ListItem","position":2,"name":"Track Record","item":"https://www.siare.com.au/track-record"},{"@type":"ListItem","position":3,"name":"Duplex construction finance, delivered early and refinanced to hold"}]}]}